Project entails a comprehensive feasibility study for the rehabilitation of a 2.5km internal road network within the Melwa Factory premises in Ja-Ela, Sri Lanka. This includes establishing control points, conducting control traversing and leveling, and performing detailed longitudinal and cross-sectional surveys. Additionally, the study involves hydrological analysis, soil testing, and the design of both drainage and pavement systems. The preparation of a Bill of Quantities (BOQ) will also be undertaken to facilitate accurate project costing and implementation planning.