This project involves preparing the final two Interim Payment Applications (IPAs #17 and #18) and As - Build Drawing Preparation for the CBL Facility Building in Ranala. It includes the preparation of 12 variation orders and taking comprehensive measurements of the entire building for the creation of detailed as-built drawings using AutoCAD. The project also encompasses compiling these drawings into an as-built drawing booklet. Additionally, participation in meetings with the employer and consultant was done to ensure all deliverables are aligned and approved.